PRELIMINARY · FOR PE REVIEW ONLY — not stamped engineering, and not for permit, construction, or fabrication.

ASCE 7-22 wind load pre-checks

Wind load audits, prepared so your PE can seal faster.

ClearPath Wind turns any U.S. address into a reproducible ASCE 7 wind-pressure audit — velocity pressure, MWFRS, the full Components & Cladding table, and a per-opening design-pressure schedule — so windows, doors, and roof products can be specified with confidence before final sealing.

Free, public ASCE Hazard Tool wind data · No account required to start.

Sample audit
CPW-2026-0001 · Rev 1
Issued

Sample Wind Audit

Project address pulled from ASCE Hazard Tool

Basic wind speed
147mph
Velocity pressure qₕ
50.8psf
Worst-case opening
DP80
Code basis
7-22ASCE

What an audit delivers

Every package cites its wind-speed source and walks through the math. Here is the headline output for the Sample Wind Audit — a coastal, Wind-Borne Debris Region site.

Site & building

Jurisdiction
AHJ resolved from project address
Code basis
2021 IBC → ASCE 7-22
Building plan
60.0 × 40.0 ft
Mean roof height
20.0 ft
Roof type
Flat (θ = 0.0°)
Risk Category IIExposure DEnclosedWind-Borne Debris Region

Opening schedule — worst first

Required design pressure per opening. IMPACT = impact-rated glazing or approved shutters also required.

IDLocationZoneAreaDPImpact
W02Corner windowWall 518 sfDP80Impact
W03Corner windowWall 520 sfDP80Impact
D01Large door openingWall 496 sfDP65Impact

Full package tabulates all openings plus the complete C&C and MWFRS tables and a worked interpolation appendix.

How it works

  1. 1

    Enter the site address

    We geocode the address, resolve the local AHJ, and flag ASCE 7-22 Special Wind Regions automatically.

  2. 2

    Pull ASCE hazard data

    Use the address to pull V from the server-side ASCE Hazard Tool API extractor, with API-sourced audit history available for repeat runs.

  3. 3

    Run the ASCE 7-22 math

    Velocity pressure, MWFRS by direction, the full C&C table, and a per-opening design-pressure schedule sorted worst-first.

  4. 4

    Hand off a PE-ready package

    A reproducible, auditable PDF with a verification checklist and seal block so the engineer of record can review and seal faster.

What this is

A preliminary wind load audit prepared as a pre-check input to the project's licensed Professional Engineer of record. Its purpose is to accelerate PE review and product selection by presenting the ASCE 7-22 calculation in a reproducible, auditable format.

What this is not

This is not stamped engineering. ClearPath Wind is not the engineer of record. Final pressures, opening protection, and product selections are subject to PE seal and AHJ approval — use this package to accelerate review, not to replace it.

Ready to run an audit?

Start with the site address — it takes a few minutes, and you can verify every wind value against the official ASCE Hazard Tool as you go.

Start a wind load audit →