PRELIMINARY — NOT STAMPED ENGINEERING. For PE review only. The licensed Professional Engineer remains responsible for the final design.
Step 1 of 9· Site address
11%
Site address
Set the project address first. WindLoadWV uses that address to geocode the site, resolve AHJ context, check Special Wind Region status, and unlock the ASCE Hazard Tool API pull on the next step.
